We have a sampling plan that involves adding to the number of quality inspections needed duing a production batch based on the percentage of poor quality products produced for that particular product. If that product has a high percentage of bad quality then production runs of that product will get an extra inspection.
Currently we get the list of poor quality articles from an outside system and imput them into an excel sheet that does the math and tells us if that product will get 1,2,3 or 4 inspections.
It would be great to see something like this integrated with the system. For example based off of the answer to an inspection question (like what product is being produced) then it would repeat a section of questions the required number of times for that product.
If anyone has found a way around this with the current system capibilities I would love to hear how you did it.