Skip to main content

1. The timestamp associated with a value entered does not align with the “Conducted on:” date. If I need to resubmit an inspection that is from a past date, the system updates the value with the current submission date instead of keeping the original inspection date. In my opinion, the timestamp should match the “Conducted on:” question. Otherwise, it creates an issue where a value can appear current even though it is from a long time ago.


2. I need to add an additional unit of measure, such as “pieces” or “units”. A currency of € or $ would also be nice, or the ability to create a custom unit of measure.


3. There is currently no way to add a new value from an inspection to the last value linked to the asset. This means that there is no way to enter a value during an inspection and automatically add it to the previous entry to show an updated total. Or even to be able to perform calculations with the last value recorded.

Be the first to reply!