For context, we use Issues as a means of reporting an issue/failure, then make an action of that issue to assign someone to resolve it.
When completing an inspection, if something fails we raise an action to have someone look at the failure (until we can make issues in inspection, hurry up SC ;) ). If they can’t fix the failure at the time, we’ll raise an issue. This is so the open issues reflects the current failures/problems.
As the action was made first from inside an inspection, it’s not linked to the issue. If we could have the ability to link existing actions to issues, this would make the workflow a lot cleaner and help with out current reporting process
Alternately, opening an issue from an action. But if both are open and need linking, being able to do this would be great