I know I can create a schedule for a specific asset for as an example - a daily pre-operation check. That works great for the 5 pallet jacks we have, that’s not too many schedules to manage.
I have another asset - racks we use to mount product to for testing/assembly - and have about 21 racks for this. I have someone do a weekly inspection of these. The template setup with a repeating section - as in he can press “+” to add a new section for each of the 21 racks there is to inspect. I am wondering if there is a way to link each section to a asset in our system. For now he just inserts each rack number into a text field.
I could create 21 schedules linked to each individual rack, but that is too many schedules to juggle.
If this is not possible, it would be awesome to have added as a feature.