I am confused about something. I want to analyze for the general control and follow-up recommendations(i am using actions for recommendaitons) in the audits. As far as I know, in this case I need to make two separate analyses/inspections. First, I can make an inspection for the general order in a facility. Second, if the actions are open, I need to evaluate this from the actions section. Can we do these two parts in a single inspection? Can I call the actions while inspecting and make a statue evaluation and report? It would be very useful to be able to show the status of previous actions in the inspection report.